From: route@monster.com
Sent: Thursday, September 15, 2016 3:37 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Project Coordinator
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Jesse R. Pageant 2724 Louisiana
Ave. N. u Crystal, MN 55427 u 763.772.6686
(H) u JPageant@my.devry.edu Degreed Manufacturing Professional with over Ten
Years of Progressive Experience. Summary of Qualifications Green Belt
Holder with Proven Abilities to Drive Results. Professional
Manufacturing Manager with Strong Background in Business Process Development. Collaborative
Leader with Style that Produces High-Performing Teams. Well Versed
in Compliance, Validation and Audit Functions in Heavily Regulated
Environments. Professional Experience Lead Extrusion operator
Febuary 2013 to Present
Areotek tEMP
aGENCY
Eden Prarie,
MN currently assigned
to Stratasys Inc. Brought on full time 8-2013 ·
Manage third
shift filament extrusion process supervising 13 extrusion and assembly staff. ·
Work on various
process improvement projects to streamline production, reduce downtime, &
improve quality ·
Operations
point-of-contact for Oracle R12 launch including documentation creation,
status upsates, and SharePoint upkeep. ·
Conduct monthly
one on one’s to align staff efforts to company goals. ·
Oversaw a 187%
increase in output while retaining a 97% or better yeild Shop Floor ControllerJune 2012 to December 2012 Kelly Services/Assigned to Cummins Power Generation Fridley, MN A manufacturer of generators for private, marine,
and Military use ·
Responsible for
supplying newly formed line with the proper level of matierials to ensure
synchronious flow. ·
Ensure part
quality equals or exceeds those set down by DOD for project ·
Work with CPG
(Cummins Power Generation) staff to streamline parts ordering process. ·
Worked with
DCMA (Defense Contract Management Agency) to determine Root Cause of test and
field fails, maintained documentation for project team, & updated
internal & external stakeholders. ·
Help establish
3rd shift operations and addition of 2nd AMMPS
(Advanced Medium Mobile Power System) line. ·
Member of CFWT
(Cross Functional Work Team, Engineering, Quality, Operations, Matierials,
and Safety) with stated goal of defining, developing, and refining AMMPS
(Advanced Medium Mobile Power System) processes, serving as project
coordinator for process improvement projects along those lines. sCORING cENTER sTAFF/Line
lead
April 2012 to Feb. 2013 tHE rIGHT sTAFF tEMP aGENCY currently assigned
to Data Recognition Corporation & Federal Package Network ·
Responsible for
assessing and scoring nationwide standardized test at the K-12 level ·
Maintain a 90%
or better accuracy rate. ·
At Federal
Package: Assist staff in maintaining an FDA compliant facility. ·
Define metrics
to begin analysis for root cause. ·
Process
improvement project leader to reduce changeover time. Production manager June 2010 to May
2011 crystal-D St.
Paul, MN A privately-held designer and manufacturer of
awards, plaques and trophies. ·
Directed the
activities of 12 team members in multiple sandblasting and laser etching
processes in the manufacture of awards and recognition plaques. ·
Analyzed work
processes resulting in productivity enhancements which resulted in reducing
labor costs by 4%. ·
Served as key
facilitator in equipment upgrade allowing customers to approve pre-production
layouts reducing returns by 12%, developing adjoining documentation for new
processes and training internal & external customers. ·
Defined,
captured, and tracked new key metrics. Posted said metrics for staff and
stakeholders alike ·
Dropped
consumable costs by 14.5% by sourcing alternate vendors with products still
meeting quality standards. production planning manager August 2009 to
February 2010 The Thymes, LLC Minneapolis, MN The Company produces fragrances, lotions, bath
and soap products. ·
Assumed
management of a staff of 39 after departure of the previous supervisor with a
13 year tenure. Increased productivity by revising work methods, and
posting individual productivity against standards on a bi-weekly basis. ·
Reduced overall
labor cost as a percent of total cost in excess of 9% during tenure. ·
Served as
project coordinator for new forecasting module implementation in current ERP
system ·
Served on a
process automation task force which enhanced throughput by 2% while still
maintaining OTD of 98.96%. PRODUCTION supervisor June 2009 to
August 2009 fairbault foods Cokato, MN A food processor
with product lines of beans, soups, beverages, pasta and vegetables. ·
Provided
guidance and leadership to a staff of 15 team members across multiple
functional departments. ·
Facilitated
training for compliance with appropriate USDA and FDA regulations for food
handling and processing. ·
Collaborated
with Sanitation for equipment shutdown and cleaning. Timed activities for
regulatory compliance and minimal production disruptions. ·
Actively
involved with multiple teams in projects for waste elimination and enhanced
production opportunities. assembly II July 2004 to February 2008 Honeywell, HBC Golden Valley, MN A division of Honeywell International involved in
the manufacture of building control systems. ·
Performed a
variety of duties from electronics assemble and troubleshooting (surface
mount and through-hole), machining, sheet metal fabrication, equipment
maintenance and repair, as well as quality audits. ·
Participated in
Lean initiatives realizing an average annual savings of $250,000. ·
Served as
Project coordinator on Lean Team, updating and disseminating updated
documentation, updating SharePoint, & training staff on updated
processes. production SUPERVISOR May 2006 to
January 2008 brookdale plastics Plymouth, MN The company engineers and manufacturers of
equipment for medical, consumer, and industrial thermoformed plastic
products. ·
Managed 25
employees with a full-scope employee relations, training, talent acquisition,
performance management, safety, production planning and scheduling. ·
Conducted
random audits of manufacturing processes for compliance with FDA and GMP
guidelines and regulations.Updated documentation from customers in company
database, coordinated with continual training of staff. Performed additional
audits for ISO and OSHA compliance. ·
As management
safety committee representative, assisted in drafting a comprehensive Safety,
Health, and Disaster Planning Manual. o
Facilitated
revamped safety training and policy enforcement yielding a 22% drop in lost
time incidents. production SUPERVISOR/oem liaison April 2000 to
August 2005 Entronix International, Inc. Rogers, MN The company is involved in the refurbishment and
remanufacture of electronic and consumer appliances. ·
Successfully
managed, during an explosive tenfold growth period, and given increasing
technical and professional responsibilities while directing up to 50
employees. ·
Provided
integral support in the systems and functionalities design of a new ERP
system with capabilities to handle a wide range of OEM parts, inventory
tracking, production control, procurement, and accounting functions. ·
Developed
scripts for the AS/400 system, many of which were subsequently refined by the
IT department and disseminated for company-wide use. ·
Appointed
Project Manager on establishment of standardized production schedule
methodology & key metrics. ·
Assigned as
Project Coodinator while developing training for retail partners on new
processes resulting a 11% throughput increase with no change in labor cost. ·
Coordinated
efforts with internal stakeholders in the establishment of a newly formed
repair division. Education & Training master of business administration - Security ManagementMarch 2012 Keller graduate school of managementEdina, MN Bachelor of arts – Project Management
and Operations Management2009 Devry UNIVERSITYSaint Louis Park, MN GPA 3.0/4.0 – Honors List CONTINUING PROFESSIONAL DEVELOPMENT Six Sigma Green
Belt Certification, Motorola 2006 Computer and Technical Proficiencies Microsoft Office
Suite (Access, Excel, Outlook, PowerPoint, Publisher, Word), AS/400 Query
Writing, Basic Flash Programming; J.D Edwards.SharePoint, Oracle, Epicor
Vista ERP/MRP Systems; Windows Operating Systems. Assisted in the development
of two in-house ERP systems. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Beginner |
|
|
|